NEW QUESTION 1
You are using Microsoft PPM to manage an e-commerce portal development program. The program is separated into individual projects that represent each area of development.
You have the following requirements:
You need to set up the e-commerce portal development program and its associated projects in Microsoft PPM.
Where should you add resources?

  • A. in the e-commerce portal development program project site
  • B. in the individual project schedules
  • C. in Build Team, in the e-commerce portal development program schedule
  • D. in the individual project sites

Answer: C

NEW QUESTION 2
HOTSPOT
You are a project manager in a large organization. During the project, some tasks have slipped, but the dependencies are still valid.
You are reviewing the project’s Gantt chart.
70-348 dumps exhibit
Use the drop-down menus to select the answer choice that answers each question.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
70-348 dumps exhibit

NEW QUESTION 3
DRAG DROP
You are managing a Biothermal Ear Heating System for Helmets project using Microsoft Project.
You must use the appropriate resource types for tasks in your project schedule. Match each resource type to its definition.
To answer, drag the appropriate resource type from the column on the left to its definition on the right. Each resource may be used once, more than once, or not at all. Each correct
match is worth one point.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
70-348 dumps exhibit

NEW QUESTION 4
Your organization is in the process of implementing Microsoft PPM.
You need to configure Microsoft PPM to ensure that project managers can choose the
tracking method for each of their projects.
On the Task Settings and Display page, what should you do?

  • A. Set the tracking method to Free form.
  • B. Select the check box Force project managers to use the progress reporting method specified above for all projects.
  • C. Clear the check box Force project managers to use the progress reporting method specified above for all projects.
  • D. Set the tracking method to Percent of work complete.

Answer: A

NEW QUESTION 5
You are a resource manager in an organization that uses Microsoft PPM for resource management. You manage two teams, one local and one remote. Project managers are instructed to always submit resource requests based on generic roles instead of named resources. Resource managers replace the generic resources with available named
resources.
Project managers must not start work on projects that have generic resources assigned. You need to replace proposed requests with committed, named resources.
Which three actions should you perform? Each correct answer presents part of the solution.

  • A. Open resource requests.
  • B. Select both the generic and named resource.
  • C. Replace the generic resource with a named resource.
  • D. Click Build Team.
  • E. Select Replace, and accept and confirm the resource.

Answer: BDE

NEW QUESTION 6
Your organization is using Microsoft PPM to manage and track all projects.
The Project Management Office (PMO) needs to know which of the projects are aligned to the organization’s strategic objectives.
You need to configure Microsoft PPM to use Portfolio Analysis.
Which two activities should you perform? Each correct answer presents part of the solution.

  • A. Set up Project Departments.
  • B. Prioritize the drivers by specifying the priority value for each driver.
  • C. Configure the Full-time Equivalent calculation.
  • D. Define business drivers.

Answer: BD

Explanation:
References:
https://technet.microsoft.com/en-us/library/dn641991.aspx

NEW QUESTION 7
You are project manager for an organization that is uses Microsoft PPM. You need to create a project deliverable for the current project.
What should you do?

  • A. In Microsoft Project, manage a deliverable.
  • B. On the project site, edit the list to include the Task ID attribute.
  • C. In Microsoft Project, use Sync Deliverables.
  • D. On the project site, create a new item in the Deliverables list.

Answer: D

Explanation:
References:
https://diegocampereira.com/2017/02/10/creating-deliverables-using-microsoft-project-professional-and-project-site/

NEW QUESTION 8
You are a project manager for an organization that uses Microsoft PPM to manage project resources. You are responsible for several projects.
Your organization is trying to improve the resource management maturity level, and has just finished the training on the new process for all project and resource managers.
Resource requests must be submitted based on units less than or equal to 75 percent, leaving 25 percent of the resources’ capacity for administrative work.
You need to enter the resource requests. What should you do?

  • A. Set the assignment units to 75%.
  • B. Set the task resource units to 75%.
  • C. Set the engagement units to 75%.
  • D. Set the task type to Fixed Units and the resource units to 75%.

Answer: A

Explanation:
References:
https://support.office.com/en-us/article/Assignment-Units-fields-1826d47c-b0d5-440c-bc41- 712c11311737

NEW QUESTION 9
HOTSPOT
You use Microsoft PPM to manage projects. You plan to use milestones in a project.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
70-348 dumps exhibit

NEW QUESTION 10
You are the Microsoft PPM administrator for a large company. The IT manager uses four business drivers for prioritization. The priority of all four drivers is set at 25 percent.
The IT manager adds an additional business driver that has a priority value set to 30 percent.
You need to create a new prioritization that includes the additional business driver. What should you do?

  • A. Create a new calculated prioritizatio
  • B. Select the drivers to prioritize.
  • C. Create a new manual prioritizatio
  • D. Select the correct department, and then select the drivers to prioritize.
  • E. Create a new manual prioritizatio
  • F. Select the drivers to prioritize, enter the value for each driver, and then choose to normalize.
  • G. Create a new manual prioritizatio
  • H. Select the drivers to prioritize, and then rank the drivers sequentially.

Answer: C

Explanation:
References:
http://deltabahn.com/ppm-driver-prioritization/

NEW QUESTION 11
HOTSPOT
You use Microsoft PPM to manage projects. You plan to add risks and issues to a project.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
References:
https://blogs.technet.microsoft.com/projectsupport/2014/05/23/project-server-2013-links-to-issues-risks-and-documents/

NEW QUESTION 12
You are a project manager for an organization that is using Microsoft Project.
You have enabled Single Entry Mode and team members update their task using timesheets.
You need to see how these updates impact your project before you approve the tasks. What should you do?

  • A. From Project Professional Backstage view, review updates.
  • B. From Project Professional Tracking Gantt, review updates.
  • C. From Project Professional Task Usage, review updates.
  • D. Go to the PWA Approvals page and run the rules you have configured.

Answer: D

NEW QUESTION 13
You are a portfolio manager for an organization that uses Microsoft PPM to manage projects. You plan to implement Power BI.
You need to import into Power BI by using the Microsoft Project Online content pack. What should you do?

  • A. In the Power BI Add content pack library, connect to Microsoft PPM by using the URL for the organization.
  • B. In the Power BI Services content pack library, connect to Microsoft PPM using the Microsoft PPM URL for the organization.
  • C. In the Power BI Import or Connect to Data tool, select Databases and mor
  • D. Then, connect to Microsoft PPM by using the database alias for the organization.
  • E. In the Power BI My Organization content pack library, connect to Microsoft PPM by using the PWA URL for the organization.

Answer: B

Explanation:
References:
https://powerbi.microsoft.com/en-us/documentation/powerbi-content-pack-project-online/

NEW QUESTION 14
HOTSPOT
You are a project manager for an organization that is using Microsoft PPM to manage projects. Projects are staffed using the enterprise resource pool.
You assign a resource to a task and set the value of Work hours to 10. You assign no overtime hours.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
70-348 dumps exhibit

NEW QUESTION 15
HOTSPOT
Your organization uses Microsoft PPM for tracking projects.
For one specific cross-functional project, different managers are responsible for different phases. These managers must be able to receive the task status updates for the project tasks that they are responsible for.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
References:
https://support.office.com/en-gb/article/Status-Manager-task-field-4bc59e8b-fa20-415f-acd0-393b8572e6c4

NEW QUESTION 16
Your organization is using Microsoft PPM to manage large projects. Within the Microsoft PPM environment, you use SharePoint sites with task lists to manage smaller projects. You turn on the Timesheets feature.
You must collect information about the time that resources spend on all projects.
You need to ensure that you can capture timesheet data from the existing SharePoint task lists.
Which two actions will achieve the goal? Each correct answer presents a complete solution.

  • A. Convert the SharePoint task lists into an enterprise project.
  • B. Use the Get Started with Project Web App web part to add existing SharePoint task lists to Project Center.
  • C. Activate the enterprise project features for the SharePoint sites.
  • D. In Project Center, add existing SharePoint task lists to PWA as a project.
  • E. In SharePoint, add existing SharePoint task lists to Project Center.

Answer: AC

NEW QUESTION 17
This question requires that you evaluate the underlined text to determine if it is correct.
Cost resources affect the schedule when they’re assigned to tasks.
Review the underlined text. If it makes the statement correct, select “No change is needed”. If the statement is incorrect, select the answer choice that makes the statement correct.

  • A. No change is needed.
  • B. Work resources.
  • C. Material resources.
  • D. Budget work resources.

Answer: B

Explanation:
References:
https://support.office.com/en-gb/article/How-Project-schedules-tasks-Behind-the-scenes-df3431ab-8d8a-4047-afc6-a87b547dbac0# toc312058394

NEW QUESTION 18
DRAG DROP
You are a team member on a project that uses Microsoft PPM timesheets for work management. You submit your timesheet by selecting Turn In Final Timesheet.
You observe that some actual work is missing from your timesheet.
You need to be able to enter actual work in your timesheet for the project period.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area, and arrange them in the correct order.
70-348 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
References:
https://support.office.com/en-us/article/Take-back-a-timesheet-that-you-sent-for-approval-54282efe-0e95-4c29-bd26-3638c82a2c1a

NEW QUESTION 19
You are managing an e-commerce portal development project by using Microsoft PPM.
In order to communicate the status of your project to your stakeholders, you want to create a real time project status report using Microsoft Excel in Office Online Services.
You need to show information about your overall project status and late tasks on your status report.
What should you do?

  • A. From the Report tab in Project Pro for Office 365, select the In Progress | Late Tasks repor
  • B. Save the report as a .pdf file to the designated reports library in PWA.
  • C. From the Project Details view in PWA, change the filter to the Late Tasks filter and copy and paste the tasks into Exce
  • D. Save to the designated reports library in PWA.
  • E. From the English folder in the PWA Data Connections library, open the OData Task Data .odc data connection file.
  • F. From the Power Query tab in Excel, select the From other sources | From ODBC option to add data to the report.

Answer: C

NEW QUESTION 20
......